Uncategorized

Civil Engineering Design, Technical Specification & Work Procedure Proyek EPC Pengadaan dan Pemasangan Sarfas Pigging di Integrated Terminal Tanjung Uban Bintan Kepri, Pertamina Energi Terminal by PT. Lerindro International.

As part of the Sarfas Pigging EPC (Engineering, Procurement, and Construction) project for PT Pertamina Energy Terminal, our main scope of work focuses on detailed engineering design (DED) and construction of the Compressor Station. Our responsibilities cover all technical aspects, from structural analysis and simulation for the compressor shelter to the design of precision foundations […]

Civil Engineering Design, Technical Specification & Work Procedure Proyek EPC Pengadaan dan Pemasangan Sarfas Pigging di Integrated Terminal Tanjung Uban Bintan Kepri, Pertamina Energi Terminal by PT. Lerindro International. Read More »

DED Hot Tap Facility & Piping by PT. Lerindro International Owner PT. Indosino & Pertamina Hulu Kalimantan Timur (PHKT) tahun 2024

Providing Detailed Engineering Design (DED) for civil works of the Hot Tapping facility at Nenang Station, East Kalimantan. This project is an important part of the Karamba Field Development, which aims to connect new gas pipelines to PHKT’s existing 12″ pipelines. Our scope of work includes the preparation of comprehensive engineering documents to ensure that

DED Hot Tap Facility & Piping by PT. Lerindro International Owner PT. Indosino & Pertamina Hulu Kalimantan Timur (PHKT) tahun 2024 Read More »

Fasilitas pengikatan narogong

PT Akal Mulia Teknika has been entrusted by PT Solusi Bangun Indonesia (SBI) to carry out the Overcapping Modular EPC (Engineering, Procurement, Construction) project in the Narogong Factory Logistics area. This CAPEX project (SN3.2407) aims to design and build an 18×10 meter protective structure to facilitate tarpaulin attachment during rainy conditions, ensuring smooth logistics operations.

Fasilitas pengikatan narogong Read More »

DED Struktur Sarana Fasilitas AFR LHO Aceh ( Carbon Mix, Starter Kit, Biomass Storage PT. Solusi Bangun Andalas tahun 2024

Information Our company has been entrusted by PT Solusi Bangun Indonesia Tbk (SIG Group) to carry out the Detailed Engineering Design (DED) project for three vital facilities at the AFR (Alternative Fuels and Raw Materials) facility in the Lhoknga Factory, Aceh. This strategic project aims to prepare all technical aspects in detail and thoroughly before

DED Struktur Sarana Fasilitas AFR LHO Aceh ( Carbon Mix, Starter Kit, Biomass Storage PT. Solusi Bangun Andalas tahun 2024 Read More »

Detailed Engineering Design (DED) Consultant for storageBuilding service Project, CIL Storage Shredder Building Extension PT. Solusi Bangun Indonesia 2025

Information Our company was appointed as the consultant to develop the Detailed Engineering Design (DED) for the AFR Storage Building expansion project at the PT Solusi Bangun Indonesia plant, Cilacap. This project aims to prepare all technical plans thoroughly before the construction phase begins. Our scope of work includes:

Detailed Engineering Design (DED) Consultant for storageBuilding service Project, CIL Storage Shredder Building Extension PT. Solusi Bangun Indonesia 2025 Read More »

LHO Retrofit Biomass Feeding Facility

Information Our company has once again been entrusted by PT Solusi Bangun Andalas (SIG Group) to carry out a multi-disciplinary Detailed Engineering Design (DED) project for the Biomass Feeding Facility at the Lhoknga Factory in Aceh. This project aims to provide comprehensive engineering documents covering Civil, Structural, Mechanical, and Electrical aspects as the main reference

LHO Retrofit Biomass Feeding Facility Read More »