Modular Overcapping Construction for Logistics SBI Narogong

PT Akal Mulia Teknika has been entrusted by PT Solusi Bangun Indonesia (SBI) to carry out the Overcapping Modular EPC (Engineering, Procurement, Construction) project in the Narogong Factory Logistics area. This CAPEX project (SN3.2407) aims to design and build an 18×10 meter protective structure to facilitate tarpaulin attachment during rainy conditions, ensuring smooth logistics operations.

Our scope of work covers all EPC stages, from the design of the aluminum alloy structure (using Eurocode 9 standards), material procurement, preparation and mobilization, foundation work, fabrication and installation of the main tent structure, to the installation of the roof and side walls using high-quality PVC membranes. The project was completed on schedule in November 2024.

Expertise

EPC Projects, Design & Build, Aluminum Structure Construction, Structural Analysis (STAAD.Pro), Modular Tent Structure Installation, Foundation Work, PVC Membrane Installation, Construction Project Management, Construction Health and Safety.

Location

Narogong, West Java.

Client

PT Solusi Bangun Indonesia (SIG Group)

Sector

Sector Cement Industry / Manufacturing / Logistics

1 komentar untuk “Fasilitas pengikatan narogong”

Tinggalkan Komentar

Alamat email Anda tidak akan dipublikasikan. Ruas yang wajib ditandai *