Hot Tapping Facility for Indosino & PHKT

Providing Detailed Engineering Design (DED) for civil works of the Hot Tapping facility at Nenang Station, East Kalimantan. This project is an important part of the Karamba Field Development, which aims to connect new gas pipelines to PHKT’s existing 12″ pipelines. Our scope of work includes the preparation of comprehensive engineering documents to ensure that all technical requirements for the hot tapping mechanism are met prior to construction. Our deliverables include complete designs for the control box foundation, piping system, and civil infrastructure such as fencing and grounding systems.

Expertise

Detailed Engineering Design (DED), Civil & Structural Engineering, Foundation Design (ACI 314, SNI 2847-2019), Piping Design (ASME B31.8), Geotechnical Analysis, Hot Tapping Procedures (API 2201), Isometric Drawings & Plot Plans.

Location

Nenang Station, Blok Wain, Kalimantan Timur.

Client

PT Indosino Oil & Gas (ISOOG) & PT Pertamina Hulu Kalimantan Timur (PHKT).

Sector

Oil & Gas / Gas Pipeline Transmission.

Tinggalkan Komentar

Alamat email Anda tidak akan dipublikasikan. Ruas yang wajib ditandai *