PT Akal Mulia Teknika has been entrusted by PT Solusi Bangun Indonesia (SBI) to carry out the Overcapping Modular EPC (Engineering, Procurement, Construction) project in the Narogong Factory Logistics area. This CAPEX project (SN3.2407) aims to design and build an 18×10 meter protective structure to facilitate tarpaulin attachment during rainy conditions, ensuring smooth logistics operations.
Our scope of work covers all EPC stages, from the design of the aluminum alloy structure (using Eurocode 9 standards), material procurement, preparation and mobilization, foundation work, fabrication and installation of the main tent structure, to the installation of the roof and side walls using high-quality PVC membranes. The project was completed on schedule in November 2024.
Sector
Sector Cement Industry / Manufacturing / Logistics